| Awnings |
Erect and attach awnings to buildings (as regulated by the ICC and city building code), including awnings incorporating signage or graphics requiring a sign permit. |
3 project verifications of completed awning installations. |
Demolition
|
Dismantle or raze entire buildings and other structures.
Excluding partial or interior demolition work associated with alterations. |
3 project verifications of completed razes (full buildings). |
| Fire Alarm Systems |
Install, test, maintain and service fire alarms including the related wiring supply not more than 50 volts. |
NICET II or approved equivalency, 3 project verifications of completed fire alarm systems. |
| Fire Sprinkler Systems |
Install automatic fire suppression systems. |
3 project verifications of completed fire sprinkler systems. |
Fireplace Appliance
|
Install non-portable listed manufactured fuel-burning fireplace appliances and associated chimneys or verts as regulated under the mechanical code.
Excluding building modifications, alterations or additions. |
3 project verifications of completed fireplace appliance installations. |
| Flammable Fuel Facilities |
Install, alter or remove tanks, piping and dispensing equipment for petroleum fuels or other fuels as regulated by the City fire code, including related electrical wiring supplying not more than 50 volts. |
3 project verifications of completed flammable fuel installation projects. |
| Gas Piping |
Install piping and fittings for supplying fuel-gas, and the replacement of water heaters as regulated under the mechanical code adopted by the city (when such water heater replacement does not involve alteration of water supply piping or appliance venting). |
ICC G33, 3 project verifications of completed gas piping installations. |
| HVAC(R) |
Installation of residential environmental non-portable heating, ventilation, air conditioning systems and the related piping, ducts, venting, appliances, controls and electrical wiring (supplying not more than 50 volts). |
ICC G29, 3 project verifications of completed new residential installations (from nothing to something). |
| HVAC(C) |
Installation of commercial environmental non-portable heating, ventilation, air conditioning systems and the related piping, ducts, venting, appliances, controls and electrical wiring (supplying not more than 50 volts). |
ICC G29, 3 project verifications of completed new commercial installations (from nothing to something). |
| HVAC(RR) |
Residential and commercial repair/replacement environmental non-portable heating, ventilation, air conditioning systems and the related piping ducts, venting, appliance, controls and electrical wiring (supplying not more than 50 volts). |
ICC G29, 3 project verifications of completed repair and/or replacement residential and/or commercial installations. |
| Roofing |
Nonstructural roof covering and materials to minimum 2:12 pitch/slop roofs including the replacement or repair of sheathing on existing roofs. Not allowed to work on flat/low slope roof systems. |
ICC G14, 3 project verifications of completed roofs that are 2:12 pitch or less. |
| Roofing(+) |
Nonstructural roof covering and materials including the replacement or repair of sheathing on existing roofs, to include flat/low slop roof systems. |
ICC G14, 3 project verifications of completed roofs that are 2:12 pitch or less. |
| Refrigeration |
Installation of non-portable evaporative, absorption and mechanically operated refrigeration equipment, including piping, vessels, controls and electrical wiring (supplying not more than 50 volts). |
ICC G29, 3 project verifications of completed new residential and/or commercial installations. |
Signs
|
Install and erect permanent signs requiring a sign permit.
Excluding electrical work. |
3 project verifications of completed sign installations |
| Solar Water Systems |
Installation of solar water heat collectors, storage tanks and related piping, related electrical wiring supplying not more than 50 volts and nonportable water piping, excluding all other electrical and plumbing work. |
NABCEP, 3 project verifications of completed solar water system installations. |
Solar Photovoltaic (PV) Systems
|
Installation of PV collectors, storage containers, related electrical wiring supplying not more than 50 volts.
Excluding all other electrical work. |
NABCEP, 3 project verifications of completed solar PV system installations. |
| Framing |
Construction Type IV and Type V structural framing systems including sheathing and siding. |
F46, 3 project verifications of completed framing projects. |
| Wireless Telecommunication Systems |
Installation of outdoor wireless telecommunication systems, including related equipment, towers, antennas and the construction of unoccupied minor related buildings housing only equipment, and associated cables and electrical wiring supplying not more than 50 volts. |
3 project verifications of completed wireless telecommunication systems. |